For Contractors

Stop Depending on Everyone Else's Piece Being Right

You run the job. We make sure the ground Data under it is never the thing that goes wrong.

Get a Quote

What Costs You Money

What We Get Called In to Fix

Bad topo, bad grading

75% of jobs start with an inaccurate topo. Everything downstream inherits that error: cut sheets, quantities, your bid.

One-man modeling shops

No backup, no professional oversight, no accountability when the model is wrong. You find out on site.

Waiting on the surveyor

A crew standing around because a control point or a staking request is stuck in someone's queue.

Change orders you can't prove

You know the dirt moved. Without a surface comparison, you can't show it.

Not Utilizing GPS, Surveying, and Machine Control Yet?

Here's Exactly What You Need

  1. 01

    Tell us your fleet

    Dozer, grader, excavator: we match the model file format to what's already in your cab.

  2. 02

    We build the first mesh

    Send us plans. We return a machine-control-ready surface in 3-5 business days.

  3. 03

    Your crew runs it

    No new hardware required if you're already running Trimble, Topcon, Leica, Cat Grade, Komatsu IMC, or Volvo.

Who This Is Built For

Site Contractors Across Texas

Earthwork, grading, and utility contractors running subdivisions, commercial sites, and county mobility projects across Texas, bidding, building, and needing the ground Data to hold up under both.

Speed, Accuracy, Confidence

We Don't Slow Crews Down. We Make Sure They Never Have to Stop.

Our service is structured around how construction actually happens: fast bids, tight schedules, and real consequences when data is wrong.

By tying verified drone data directly into machine control models, earthwork takeoffs, and grading audits, we eliminate the surprises that cause rework, delays, and lost margin.

Get accurate quantities before iron hits the ground

Reduce excess dirt import and overgrading

Catch grading issues before they turn into change orders

Build faster with data you can trust

What to Expect

Fast

We deliver precise data, verifying existing site conditions with a 3-5 day turnaround.

Precise

We integrate the latest technology to ensure every model reflects the design and real-world site conditions.

Schedule Sync

We sync with your project schedule and typical construction process to maximize efficiency.

Frequently Asked Questions

Do I need my own machine control equipment to get started?

No. If you don't have equipment yet, tell us your fleet plans and we'll walk you through exactly what you need, no new hardware required if you're already running Trimble, Topcon, Leica, Cat Grade, Komatsu IMC, or Volvo.

How do I get a model built for my job?

Send us your plans. We return a machine-control-ready surface in 3 to 5 business days, built in Civil 3D so it matches what your engineer designed.

What if the topo turns out to be wrong?

That's exactly the problem we exist to catch early. About 75% of jobs start with an inaccurate topo, and everything downstream (cut sheets, quantities, your bid) inherits that error if it's not caught. Our capture process is built to catch it before it costs you.

Can you prove a change order was justified?

Yes. A surface-to-surface comparison shows exactly how the dirt moved, so you're not relying on someone's word that the ground changed, you can show it.