Give your crew a digital surface they can build from. Civil Mesh turns project plans into machine control models for dozers, graders, excavators, and field positioning systems.
Built around your project
From design plans to field-ready guidance
A machine control model translates the planned elevations and linework into information your equipment can use. Getting the surface right before mobilization helps your crew identify questions early and work from a consistent version of the design.
What we deliver
- Built in Civil 3D, the same platform your engineer designed in
- Ready for your base/rover GPS setup, data collector, and machine control system
- Compatible with Trimble, Topcon, Leica, Cat Grade, Komatsu IMC
- Revision turnarounds for change orders included
From plans to execution
How the process works
- 01
Review the supplied plans, survey information, and equipment requirements.
- 02
Build the surface and linework in Civil 3D and resolve questions with your team.
- 03
Deliver the agreed files and coordinate revisions when the plans change.
What to send us
- Current grading and civil plans, including the latest revisions
- Available CAD files and existing-ground survey information
- Your machine control brand, controller, and required file format
- Project location, scope, and the date your crew needs the model
Missing something? Send what you have and we can discuss what is needed.
Useful tools & field insights
Frequently Asked Questions
What does a machine control model include?
The service includes a 3D surface and linework for the agreed project scope. Tell us your equipment and controller so we can confirm the required delivery format before work begins.
Which systems do you support?
Civil Mesh supports Trimble, Topcon, Leica, Cat Grade, and Komatsu IMC. Compatibility depends on the equipment and controller; send those details with your plans.
How much does machine control modeling cost?
Our published average is $1,850 per model. Site size, complexity, and available source information determine the quote. Typical turnaround is 3–5 business days.
Does a model replace field control?
No. The model needs to be used with appropriate project control and field verification. Ask us about construction surveying if your project also needs control points or staking.